Kitchen Quote Comparison Checklist
A printable 16-point decision worksheet designed to normalize residential kitchen bids. Never compare contractor bottom lines until every underlying specification—from 1/2" plywood cabinet boxes and laser-templated stone cutouts to dedicated 20A electrical circuits, ducted ventilation, and trade permits—is verified on an identical scope.
Hi [Contractor], I am requesting an itemized quote for a [10x10 ft (100 sq ft) Kitchen Remodel] based on CSI 12 35 30 specifications: - Cabinetry: [Semi-Custom Plywood Box] construction with solid hardwood dovetail soft-close drawers - Countertops: [Quartz] with laser templating and polished undermount sink cutout - Backsplash: Tile installation over 1/2" cement backer board (not painted drywall) - Plumbing & electrical: Sink, faucet, dishwasher reconnects, and dedicated 20A GFCI/AFCI circuits - Permitting and debris cleanup included Please provide line-item pricing for labor, materials, and disposal.
1. Baseline Project Specifications Record once before gathering quotes
2. Same-Scope Verification Checklist (16-Point Specification Audit)
| Scope Item & Checkpoint | What to Verify (Same-Scope Benchmark) | Quote 1 Contractor A | Quote 2 Contractor B | Quote 3 Contractor C |
|---|---|---|---|---|
| Group A: Cabinetry Quality, Drawers & Wall Anchoring | ||||
| 1. Cabinet Box Construction | Specifies 1/2" to 3/4" furniture-grade plywood side, top, and bottom panels. Prohibits stapled particleboard or engineered MDF boxes vulnerable to sink water swelling. | [ ] Plywood Box | [ ] Plywood Box | [ ] Plywood Box |
| 2. Drawer Boxes & Glides | Solid hardwood dovetail jointed drawer boxes (5/8" thickness) paired with full-extension undermount soft-close glides (e.g., Blum Tandem or equivalent). | [ ] Dovetail + Soft | [ ] Dovetail + Soft | [ ] Dovetail + Soft |
| 3. Cabinet Installation & Anchoring | Installation includes continuous laser leveling, scribed filler strips to out-of-plumb walls, and structural cabinet screws driven into wall studs (no drywall screws/nails). | [ ] Stud Screwed | [ ] Stud Screwed | [ ] Stud Screwed |
| Group B: Countertop Fabrication, Seams & Backsplash Substrate | ||||
| 4. Countertop Fabrication & Sink Cutouts | Digital laser templating included; CNC polished undermount sink cutout with silicone seal; concealed steel cantilever support brackets on island overhangs exceeding 10". | [ ] Laser Templated | [ ] Laser Templated | [ ] Laser Templated |
| 5. Overhang & Seam Placement | Standard 1.5" front edge overhang specified; seam locations mapped away from high-stress sink cutouts and cooktops, bonded with color-matched two-part epoxy. | [ ] Seams Mapped | [ ] Seams Mapped | [ ] Seams Mapped |
| 6. Tile Backsplash Substrate Prep | Installation over 1/2" cement backer board (HardieBacker / WonderBoard) or membrane substrate; prohibits gluing tile directly over painted drywall or torn wallpaper. | [ ] Cement Board | [ ] Cement Board | [ ] Cement Board |
| Group C: Electrical Circuits, Plumbing & Hood Ventilation | ||||
| 7. Plumbing Rough-in & Fixture Trim | New 1/4-turn brass ball shut-off valves, braided stainless supply lines for sink and dishwasher, new PVC P-trap assembly, and garbage disposal installation included. | [ ] New Valves/Trim | [ ] New Valves/Trim | [ ] New Valves/Trim |
| 8. Dedicated 20A GFCI/AFCI Circuits | NEC Article 210 compliance: at least two dedicated 20-amp small appliance branch circuits for countertop outlets, plus dedicated circuits for microwave, dishwasher, and disposal. | [ ] 20A Circuits Inc | [ ] 20A Circuits Inc | [ ] 20A Circuits Inc |
| 9. Range Hood Exterior Venting | Rigid galvanized/aluminum ductwork routed through exterior wall or roof cap with damper; avoids inferior recirculating charcoal filters that recirculate grease film. | [ ] Exterior Ducted | [ ] Exterior Ducted | [ ] Exterior Ducted |
| Group D: Flooring Integration, Drywall & Surface Finishing | ||||
| 10. Flooring Scope & Cabinet Sequencing | Finished flooring installed wall-to-wall under cabinets (or shimmed subfloor to preserve 36" counter height and allow dishwasher removal without pulling countertops). | [ ] Wall-to-Wall | [ ] Wall-to-Wall | [ ] Wall-to-Wall |
| 11. Drywall Repair & Level 4 Skim Coat | Complete drywall remediation behind removed soffits and old splash areas; taped, mudded, and sanded to a Level 4 smooth skim coat ready for uniform paint. | [ ] Level 4 Finish | [ ] Level 4 Finish | [ ] Level 4 Finish |
| 12. Kitchen Enamel Paint Grade | One coat primer plus two finish coats of moisture-resistant satin or semi-gloss acrylic enamel containing antimicrobial mildewcides for easy scrubbability. | [ ] Satin Enamel | [ ] Satin Enamel | [ ] Satin Enamel |
| Group E: Appliances, Site Protection, Permits & Warranties | ||||
| 13. Appliance Delivery, Unboxing & Setup | Receiving, unboxing, final positioning, leveling, range anti-tip bracket installation, water line hookup, and packaging haul-away included in turnkey contract. | [ ] Turnkey Setup | [ ] Turnkey Setup | [ ] Turnkey Setup |
| 14. Dumpster Staging & Floor Protection | Heavy-duty Ram Board taped along all traffic pathways; plastic zip-wall dust containment with negative air pressure; dedicated dumpster placement and disposal fees included. | [ ] Ram Board + Bin | [ ] Ram Board + Bin | [ ] Ram Board + Bin |
| 15. Municipal Trade Permits (MEP) | Contractor acts as permit applicant of record for building, electrical, and plumbing permits ($500–$1,500), scheduling all rough-in and final municipal inspections. | [ ] Permits Included | [ ] Permits Included | [ ] Permits Included |
| 16. Workmanship Warranty & Milestones | Written 1-to-5-year contractor labor warranty; deposit capped at 10%–15% maximum; milestone payment schedule strictly tied to verified passed trade inspections. | [ ] ___ Yrs Warranty | [ ] ___ Yrs Warranty | [ ] ___ Yrs Warranty |
3. Bottom-Line Scope Normalization Calculation
Add back omitted line items to determine the true turnkey installed price per square foot.
| Cost Component | Quote A | Quote B | Quote C |
|---|---|---|---|
| Contractor Proposed Total Bid ($) | |||
| Kitchen Finished Footprint (Sq Ft) | |||
| Raw Price Per Sq Ft (Total ÷ Area) | $ ______ / sq ft | $ ______ / sq ft | $ ______ / sq ft |
| Scope Add-Backs for Omitted Items (Permits, plywood upgrade, hood vent, backsplash prep, etc.) | |||
|
Normalized Same-Scope Total
Raw bid + all omitted scope costs | $ ____________ | $ ____________ | $ ____________ |
|
Normalized Price Per Sq Ft
Only valid apples-to-apples comparison metric | $ ______ / sq ft | $ ______ / sq ft | $ ______ / sq ft |
Three Most Common Kitchen Remodel Quote Traps Homeowners Encounter
Bids that boast "solid wood doors" frequently hide cheap 3/8" or 1/2" particleboard or MDF cabinet boxes inside. In a high-humidity kitchen, minor plumbing drips under the sink or steam from the dishwasher cause particleboard to swell, sag, and degrade within 3 to 5 years. Always require 1/2" to 3/4" furniture-grade plywood boxes in writing before comparing cabinet allowances.
Cooking generates grease aerosols, moisture, and VOCs. Lowball quotes routinely omit the specialized labor of core drilling through exterior brick or siding to install rigid metal ductwork, substituting an ineffective recirculating charcoal filter hood. This leaves a sticky grease film over brand-new quartz counters and cabinets and compromises indoor air quality.
Kitchen remodels require electrical, plumbing, and mechanical permits to verify 20A GFCI circuits, gas lines, and proper drain venting. Cut-rate contractors skip municipal permits to save $600–$1,500 and evade third-party inspection scrutiny. Working without permits exposes the homeowner to insurance denial in the event of an electrical fire and creates major disclosure liabilities during home resale.