Bathroom Quote Comparison Checklist

A printable 16-point decision worksheet designed to normalize residential bathroom bids. Never compare contractor bottom lines until every underlying specification—from continuous wet-area waterproofing membranes and 24-hour flood tests to dedicated 20A GFCI circuits, exterior exhaust ducting, and municipal trade permits—is verified on an identical scope.

← Bath Cost Guide Bath Calculator →
Updated: 2026-11-07 • Standard Form V1.0 • Zero Referral Affiliation

The Golden Rule of Contractor Quote Comparison

A contractor bidding $8,500 often omits sheet membrane waterproofing, skips the 24-hour shower pan flood test, glues tile directly to standard drywall, reuses rusted shut-off valves, and skips municipal plumbing permits. A $14,000 bid specifies Schluter Kerdi waterproofing, 1/2" Durock backer board with alkali-resistant tape, a licensed master plumber, and a 5-year written leak warranty. Compare $/sq ft ONLY where scope is identical.

1. Homeowner Baseline Parameters

Room Dimensions:
Wet Area Scope:
Vanity Width:
Floor Tile Area:

2. The 16 Critical Bathroom Specifications

CSI 22 40 00 • 09 30 00 Scope
Scope Specification Item Industry Standard Target Bid A Bid B Bid C
Group A: Wet Area Waterproofing & Tile Substrate
1. Shower/Tub Waterproofing Membrane

Continuous sheet membrane vs. liquid paint-on

Schluter Kerdi / Wedi bonded sheet membrane (ANSI A118.10) □ □ □
2. Shower Pan 24-Hour Flood Test

Standing water test prior to tile setting

Plug drain and fill pan with 2" water for 24 hours to prove zero leak □ □ □
3. Cement Backer Board & Seam Tape

Substrate behind shower wall tile

1/2" Durock/HardieBacker with alkali-resistant fiberglass mesh tape □ □ □
4. Subfloor Rot Inspection & Unit Rate

Pre-priced rotten OSB/plywood replacement

Explicit $/sq ft rate for 3/4" subfloor replacement ($25–$45/sq ft) □ □ □
Group B: Plumbing Rough-in & Fixtures
5. Shower Mixing Valve & Anti-Scald

Pressure-balancing valve (ASSE 1016)

All-brass rough-in valve body (Moen, Kohler, Delta) with stops □ □ □
6. Water Supply Lines & Shut-Off Valves

Fixture isolation stops

New 1/4-turn brass ball valves on toilet & vanity supply lines □ □ □
7. Drain-Waste-Vent (DWV) Modifications

PVC/ABS P-trap and stack pitch

All-new schedule 40 PVC trap assembly with cleanout access □ □ □
8. Toilet Flange & Heavy-Duty Wax Ring

Flange secured over finished tile

Flange mounted flush on top of finished tile with solid brass closet bolts □ □ □
Group C: Vanity, Countertop & Flooring
9. Vanity Cabinet Box Construction

Plywood vs. particle board

1/2" to 3/4" solid plywood box with soft-close undermount slides □ □ □
10. Vanity Countertop & Undermount Sink

Fabrication & mechanical clips

Quartz or vitreous china top with epoxy-anchored sink clips □ □ □
11. Floor Tile Uncoupling Membrane

Anti-fracture layer under floor tile

Schluter Ditra uncoupling membrane to prevent floor tile cracking □ □ □
Group D: Electrical, Ventilation & Finishes
12. Dedicated 20A GFCI Circuit (NEC 210)

Dedicated countertop receptacle circuit

Dedicated 20-amp, 120V circuit with GFCI outlet within 36" of sink □ □ □
13. Exhaust Fan CFM & Exterior Ducting

Direct outside exhaust (IRC R303.3)

Minimum 80–110 CFM fan ducted through soffit/roof with damper (no attic dumps) □ □ □
14. Moisture-Resistant Drywall & Paint

Non-tiled wall surfaces

Mold-resistant drywall (greenboard) with satin/semi-gloss antimicrobial paint □ □ □
Group E: Site Protection, Permits & Warranties
15. Municipal Plumbing & Electrical Permits

Permits filed under contractor license

Trade permits pulled with rough-in and final plumbing/electrical sign-offs □ □ □
16. Workmanship Warranty & Milestone Cap

Written guarantee & deposit terms

Minimum 2-year written warranty; deposit capped at 10–15% max upfront □ □ □

3. Interactive Bathroom Bid Normalizer

Enter bottom-line quote amounts and adjust for missing specifications to calculate true apples-to-apples cost.

Contractor Bid A Low Bidder
Normalized Total: $0
Normalized / Sq Ft: $0/sq ft
Contractor Bid B Mid-Range
Normalized Total: $0
Normalized / Sq Ft: $0/sq ft
Contractor Bid C High Tier
Normalized Total: $0
Normalized / Sq Ft: $0/sq ft

4. Three Fatal Bathroom Bidding Traps to Avoid

• Pitfall 1: Liquid Membrane Skips

Many cut-rate contractors apply only a single thin coat of liquid paint-on waterproofing over drywall or skip the 24-hour shower pan flood test. If the water barrier has pinhole leaks, moisture silently seeps into the subfloor framing, creating thousands of dollars in rotted structural joist repairs.

• Pitfall 2: Attic Exhaust Dumping

Tying a new 110 CFM exhaust fan into the attic cavity or pointing it toward a ridge vent rather than cutting a direct exterior duct penetration through the roof or soffit violates IRC R303.3 and leads to mold growth on the underside of roof sheathing.

• Pitfall 3: Reused Outdated Wiring

Reusing older 15-amp branch wiring shared with bedrooms causes bathroom breakers to trip whenever high-draw hair dryers (1,875W) are used. Ensure bids specify a dedicated 20-amp GFCI circuit per NEC Article 210.